Work on the roof and front wall of the entryway now began in earnest.
Aluminum-faced insulation was placed in the wall panels
In only ten working days the workers installed windows and a roof over the entry-way.
Hallways will connect each floor to the main building.
The lower right windows are deeply inset, something that was not apparent
in the model or drawings
Installation of interior wiring continued.
Windows and roofing of the front (cemetery side) entry were finished.
After the septic and gutter drain pipes were installed
a fire hydrant and curbs were installed in the lower parking lot.
The use of gravel caused Mt. Brandt to shrink considerably,
while Mt. McFall (not shown) returned to its original shape.